Test Scheduling


Test scheduling is an important issue in a testing program. The customer should be aware of the following:

A program is placed on the laboratory test schedule upon receipt of a purchase order, approval of procedure, and either receipt of a firm date for delivery of the equipment or actual equipment delivery.
Scheduling is done on a "first-come first-served" basis, upon availability of laboratory test equipment.
In the event of a failure during testing, the test will be stopped. The unit under test will remain on the test stand pending instructions from the customer. However, charges may be incurred awaiting disposition from the customer.
Upon disposition, the test may be resumed or stopped and the equipment removed for correction of the failure mode. Upon receipt of the revised test item, the test may be resumed or restarted if the laboratory test equipment is available. If not the test will be placed on the laboratory schedule for future testing.

 

 



Home     About     Standards & Specs     Equipment & Facilities     Contact
Related Links     Sitemap    Articles      Photos      Videos

©2004-2014 Aero Nav Laboratories Inc., All Rights Reserved
14-29 112th Street, College Point, NY 11356
Toll Free: 1-800-680-6608    Phone: 718-939-4422    Fax: 718-539-3719